Nordic hub in Finland
Finland consolidates as our epicenter for Data Centers and BESS, with 2,625 MW in active development and ideal climate and grid conditions.

Development of solar parks, wind farms, BESS systems and Data Centers with presence in 5 countries.
Under the leadership of Enrique Garrido, we are a corporate group committed to global decarbonization through the development of next-generation energy infrastructure.
Large-scale solar parks from 3MW to 400MW. Generation optimization and maximum yield per hectare.
Onshore projects harnessing wind resources for large-scale generation.
Battery energy storage systems for grid stability and efficiency.
Next-generation infrastructure with maximum energy efficiency and premium connectivity.
Solano Renovables España
Group headquarters. Solar, wind and BESS in the Iberian Peninsula. Operations base and strategic direction.
Solano Renovables México SRL
Solar, BESS and Data Center development in Mexico's Bajío region. 320MW solar, 670MW BESS (7 projects), and a 300MW Data Center in Querétaro and Guanajuato. 1,290MW in development.
Solano Renovables Romania SRL
BESS, solar and Data Center development in the Eastern European market. BESS 200MW / 800MWh for grid stabilization.
Solano Renewables Finland Oy
Nordic Data Center and BESS hub with natural climate efficiency, dark fiber and renewable energy. 3 DC and 1 BESS. 2,625MW in development.
Solano Odata SAS · Solano Renovables Colombia SAS
Over 2,000MW developed and sold to Enel Green Power and Lilan International. Fundación (132MW) and La Loma (187MW) built and operational.
The Nordic market offers ideal conditions for next-generation energy and technology infrastructure. 3 Data Centers and 1 BESS system in active development.
The Nordic climate reduces cooling costs by up to 40% compared to Southern European locations.
Access to the Nordic grid with over 80% renewable energy mix and stable, competitive prices.
Direct routes to Frankfurt, Stockholm and major Asia-Pacific hubs. Minimum latency.
4 projects across multiple locations. 3 Data Centers and 1 BESS system with 2,625MW capacity in development.
Every closed deal with its buyer, technology and capacity.
Sigüenza comprises 12,700 panels over 10 ha, generating 3.90 GWh per year.
Co-development and delivery with Cobra, Acciona, Sowitec and Fonroche.
An example of our end-to-end development model: from securing the grid connection point to selling the built asset.
Colombian Caribbean · Cesar, Colombia
Secure a site with a firm grid connection point in one of Colombia's highest-irradiation regions, and take the project to Ready to Build with full technical, environmental and legal guarantees.
Land securing, environmental and topographic pre-feasibility studies, and complete processing of licenses and permits. Plant design optimized to maximize generation per hectare.
187 MW of photovoltaic capacity built and operating, integrated into the portfolio of one of the world's largest renewable operators. Part of the 1,069+ MW the group has developed and transferred to Enel Green Power.
322 MW built and more than 4,100 MW in active development.
Capacity secured at the substation.
Lease or purchase agreements signed with owners.
Impact studies and feasibility assessment.
Topographic survey and plant layout.
Permits processed through to Ready to Build.
Asset transfer or delivery alongside a partner.
Finland consolidates as our epicenter for Data Centers and BESS, with 2,625 MW in active development and ideal climate and grid conditions.
We closed the sale of our Colombian solar portfolio to one of the world's largest renewable operators.
The group reaches over 4,100 MW in development, across 5 countries and four technologies: solar, wind, BESS and Data Centers.
We are open to collaboration and co-development opportunities in renewable energy and technology infrastructure.